Mead Street, Donnybrook

The client required extra material in order to correct the existing surface to a level acceptable to join a car park extension with the existing road, the growing schools (Donnybrook Primary School & Donnybrook District High School – Middle School), are now far less congested during pick up and drop off.

0 Continue Reading →

Eaton Fair

An intense building site job with an unwavering deadline. This was a challenging project that showed what can be achieved when the pressure is on.

0 Continue Reading →

Bunbury Port Access Road

Malatesta rendered Asphalt services whereby 126,000m² of asphalt was laid in a matter of months. This project provided an important link between the Industrial and Rail sites in the Picton and Davenport areas with the Bunbury Port.

0 Continue Reading →